MAX XL Long Lead LED Rock Lights

The most universal LED rock light LUX Lighting Systems builds. The MAX offers magnetic mounting, high output, super broad light coverage, IP68 waterproof rating, incredible durability and 10 foot leads. These features, along with several color choices, make these the most popular LED rock light we build. Perfect for Jeeps, trucks, UTV's, RV's, marine, and street.

XL version comes with Extra Long 20 foot leads! 

Upgrade to a Pro-Pack and get a Pro-Installer Accessory Pack for FREE! The Pro-Pack has everything you need for a clean, professional OEM quality installation including the LUX Pro-Installer with LUX logo rocker switch - a $129 value! 

Applications:

[center] [center]
      • Q. How do they mount?
        A. All our lights feature high power neodymium magnetic mounting. Just place the light on a flat metal surface and you are done. No drilling, screwing or taping required. The strength of the magnets far exceed what is required to hold the lights in place.

        Q. How do they hook up?
        A. All our lights are designed to run on 12v DC automotive systems. They simply have a black negative wire and red positive wire. They can be connected to any fused and switched system, sPOD, Switch Pros or a number of other accessory switch panels, or you can use our Pro-Installer for a clean, reliable, professional installation.

        Q. How bright are they?
        A. Have you stared at the sun lately? We do not post lumens because it is an irrelevant measurement for rock lights, there is also no governing our competition to see if their specs are accurate. We will say that in a consumer test where the brands of the lights were not given that LUX won 9 to 1 in brightness and light coverage when mounted to a Jeep even over competitors costing 4X as much. We have a 100% money back satisfaction guarantee backing this up.
      • Premium Lead Wire
        We are proud to offer the best lead wire in the industry. The XL series features SUPER LONG 20 FOOT LEADS! We have our lead wire specially made just for us to our specs. Designed to be flexible, yet incredibly durable, able to withstand high heat engine compartments, fuel and oil resistant - and the best part? It is manufactured right here in America for us - NOT made in China!

        Magnetic Mounting
        The LUX proprietary and patented magnetic mounting system is more than just a mounting system. Our magnets are engineered into the thermal path of the LEDs moving heat away from the LEDs into the metal they are mounted to! This allows us to produce a tremendous amount of light out of a very small package. Our customers love them because they are easy to install, can be moved easily and do not require any drilling, screwing, taping, or gluing to install.

        Solid Polycast Body
        The LUX proprietary and patented solid polycast body sets us apart from all other LED rock lights. Unlike our competitors that have a thin aluminum housing and a thin polycarbonate lens, the LUX lights are a solid block of Epoxy - completely impenetrable from the elements and nearly indestructible. In addition to providing the strongest LED rock light out there, our polycast body gives the broadest light pattern on the market because there is no need to 'shroud' the LEDs with an aluminum housing.

        Committed to America
        At LUX we are committed to building our products right here in America. Not only do we build them here, we are also committed to sourcing as much of our raw materials from American manufacturers as we can. From our lead wire, to our polymer resin, right down to the rubber band holding the leads.... if we can buy it in America - WE DO!

      • Jeep
        From professional rock crawling teams to mall crawlers the MAX from LUX has you covered. This light is tough enough and bright enough for any hard core rock crawling needs and cool enough to look amazing when you need to.

        Trucks
        From rock crawling to under glow to accent lighting to under the rail truck bed lighting to work truck toolbox lighting the MAX does it all.

        ATV/UTV
        When it comes to looking good in the dunes or the desert, in the garage or the race track the MAX dominates the market for LED under glow for ATV's and UTV's - not a better light out there - period.

        RV/Camping
        Hate bugs? try our yellow MAX for ground lighting under your RV. Use our under the rail truck bed lights for your tow vehicle. Perfect for setting up camp at night, just pop the magnetic lights off and move them to the outside of your truck bed. Need more light backing up to your RV at night? Pop them of and stick them our your rear bumper for MASSIVE back up lights.

        Marine
        When we say waterproof we mean it. Our lights are solid epoxy - no where for the water to go. Simply use a high temp VHB tape from 3M to mount to stainless surfaces.

        Street
        From street rods, to hot rods, to custom cruisers, to rat rods, to low riders to drifters the MAX is the perfect light to set your ride apart. You work hard so your car looks good during the day - shouldn't it look just as good at night?

Stay in the know