Monster XL (Long Lead) LED Rock Lights for Trucks

The Monster is the ultimate LED rock light. With (8) ultra high efficiency LED's it is the brightest LED rock light on the PLANET and is the same size as the MAX. The Monster from LUX offers magnetic mounting, high output, super broad light coverage, IP68 waterproof rating, incredible durability and premium leads. These truly are the Ultimate LED Rock Light!

XL version features Extra Long 20 foot leads!

Upgrade to a Pro-Pack and get a Pro-Installer Accessory Pack for FREE! The Pro-Pack has everything you need for a clean, professional OEM quality installation including the LUX professional installation kit, and LUX logo rocker switch.  

Applications:
[center] [center]

Stay in the know